This paper discusses the study, design and permitting of the Marco Island surface water membrane filtration system and describes how the project met the City’s needs while meeting several logistical and permitting challenges.

Details
First NameJoseph
Last NameElarde, PE
Keywordsplant expansion, reverse osmosis, permitting
Year11
FileTh-2A-2_JoeElarde.pdf