This presentation will discuss the operation of a 4 MGD pressurized two-stage Ultrafiltration (UF) plant over a 14 month period at the Oliver-Mercer-North Dunn (OMND) Drinking Water Treatment Facility. The OMND Treatment Facility utilizes Ultrafiltration followed by low pressure Reverse Osmosis Softening to produce a blended Finished Water capacity of 3.6 MGD. Overall integrity performance of the plant for fourteen month period will be discussed in detail. Trans-Membrane Pressure (TMP), flux, temperature corrected permeability (specific flux) and cleaning efficiency for both the first and second UF stages will also be presented.
Operations and LRV Calculations at North Dakota?s Southwest Pipeline Project OMND Water Treatment Facility