This paper provides a summary of the membrane evaluation, condition assessment, evaluation results, design considerations for the system upgrade and a discussion of several items found during commissioning.

Details
First NameMickal / Steve / Joseph / Tom / Howard / Nick
Last NameWitwer, PE / Messner / Elarde, PE / Sivert / Brogdon / Easter, PE
KeywordsReplacement, Upgrades, NF
Year18
FileTh-6-6_Witwer_Mickal.pdf