This dual membrane plant was designed in a time when many dual membrane plants were being designed. Now, with changes in technology the designer is faced with challenges. How do you reconcile needed differences in design and warranties in an operating plant? This is directly applicable to current issues like universal racks, it will be critical to try to accommodate changes over time while protecting owners and cost.
Lessons From an Expansion of a Dual-Membrane Surface Water Plant
| Details | |
|---|---|
| First Name | Karla J. / Douglas / Teresa |
| Last Name | Kinser, PE / Drummey / Konda, PE |
| Keywords | Dual Membrane, Surface Water Treatment, Expansion |
| Year | 18 |
| File | W-1-5_Kinser_Karla.pdf |