The City of Carlsbad installed a 3.4 mgd UF facility to expand the reuse from the adjacent Encina Water Reclamation Facility. Water quality from the upstream wastewater plant resulted in various operational challenges during initial plant start-up. The plant operators and design-build team were able to adjust maintenance cleaning approaches and replace strainers to provide stable operation at design capacity, addressing challenges of operation with the secondary effluent.

Details
First NameGreg / Lindsey / Terry / Lindsay / Lanaya
Last NameWetterau, PE, BCEE / Stephenson / Smith / Leahy / Voelz
KeywordsUF, Carlsbad, Reuse
Year18
FileW-1-1_Wetterau_Greg.pdf