The City of Carlsbad installed a 3.4 mgd UF facility to expand the reuse from the adjacent Encina Water Reclamation Facility. Water quality from the upstream wastewater plant resulted in various operational challenges during initial plant start-up. The plant operators and design-build team were able to adjust maintenance cleaning approaches and replace strainers to provide stable operation at design capacity, addressing challenges of operation with the secondary effluent.
Expanding Reuse for Carlsbad, California, Using Membrane Technologies
| Details | |
|---|---|
| First Name | Greg / Lindsey / Terry / Lindsay / Lanaya |
| Last Name | Wetterau, PE, BCEE / Stephenson / Smith / Leahy / Voelz |
| Keywords | UF, Carlsbad, Reuse |
| Year | 18 |
| File | W-1-1_Wetterau_Greg.pdf |