This paper describes the pilot testing and retrofit of a CA UF drinking facility treating a degraded quality surface water which operates with ZLD. Challenges encountered during the project include: permtting, deteriorating source water quality and continued operations. Final design eliminates one stage, decreases flux by 15% and reduces energy and operating costs.

Details
First NameGreg
Last NameWetterau, PE, BCEE
KeywordsZero liquid discharge, waste minimization
Year09
FileTh-1B-3_GregWetterau.pdf