The presentation summarizes alternative project delivery methods for membrane technology-based desalination water treatment plants. Alternative delivery methods and related risks including design-build, design-build-operate and design-build-finance-operate are compared to traditional design-bid-build.
Desal Design-Build-Operate: Modern Project Delivery Methods for Modern Membrane Technology
| Details | |
|---|---|
| First Name | Eric |
| Last Name | Petersen |
| Keywords | desalination, delivery, design build |
| Year | 06 |
| File | M-1A-2_EricPetersen.pdf |