This presentation discusses the pilot study results for the Canyon water treatment plant in the city of Azusa CA. Also discussed is membrane basics, evaluation and water properties. In the actual case study the reader is walked through the decision making process including several side by side pilot tests. Results are then compared looking closely at pathogen removal credits.

Details
First NameVal
Last NameFrenkel, PhD, PE
KeywordsMF/UF Case Study, City of Azusa pilot study, membrane filtration study
Year05
FileT2_3_FrenkelVal.pdf