This presentation describes operational issues with a water r3eclamation plant that includes membrane bioreactors. Problems were experienced with rapid flux decline. The problem was traced to the screen size which was replaced with a smaller screen. Problem solved.
A Tale of Two Screens & Other MBR Things
| Details | |
|---|---|
| First Name | Ben |
| Last Name | McConkey |
| Keywords | MBR, screening, operation |
| Year | 12 |
| File | 1-3_McConkeyBen.pdf |