The presentation will detail the case study of OMND in Zap, ND. This UF and RO system, with secondary UF, began in 2012 after a demonstration pilot in 2010 proved flux and recovery rates were sustainable. The system was then expanded in 2014 to a finished water capacity of 5.2 MGD.
A Case Study of OMND UF/RO Plant in Zap, ND
| Details | |
|---|---|
| First Name | Madalyn |
| Last Name | Epple |
| Keywords | UF Surface Water Treatment, RO Following UF, Drinking Water |
| Year | 21 |
| File | 3-5_Epple_Madalyn.pdf |